Computed Earth-Venus two-working-body ballistic cycler ev5-8 (k = 5, both planets bend)
earth-venus-two-working-body-cycler-ev5-8-2026 · source: this-project ·
validation: V1 · candidate
Signature
- Bodies
- E-V
- Primary
- Sun
- Sequence (canonical)
-
V-V-E-E-E - Sense
- n/a
- Orbit class
- Cycler strict cycler (infinite returns)
- Cycler class
- multi-arc
- Trajectory regime
- ballistic
- Maintenance ΔV band
- unclassified
- Model assumption
- circular-coplanar Idealised: planets on circles, coplanar ecliptic.
- Period
- 7.994 yr (5 × E-V synodic)
DERIVED (this project): 5 Earth-Venus synodic periods = 2919.722 d in the ideal model (Venus period 0.61520 yr, Earth 1 yr).
- Source ephemeris
- ideal circular-coplanar model; real-ephemeris patched-conic rung (d) on Standish J2000 mean elements and on DE440 (blend to lambda 1, closure dV; the DE440 shoot) Ephemeris model the source states its numbers were computed against.
- Priority date
- 2026-10-08
V∞ at encounters
- E (encounter 1)
- 14.25 km/s DERIVED (this project, ideal-model zero; data/973_ev/k5_gauntlet.json). Earth turns 7.21 / 8.00 / 8.00 deg; largest demanded/available ratio 0.301 at the 200-km floor.
- V (encounter 2)
- 7.95 km/s DERIVED (this project). Venus turns 45.45 / 45.45 deg; largest ratio 0.855 at the 300-km floor (required altitude 2,121 km).
Cycle-level identity (multi-arc invariants)
- Aphelion ratio (AR)
- —
- Turn ratio (TR)
- —
- Transit times (days)
- 730.5 d, 1095.75 d, 593.155 d, 449.404 d, 50.913 d
Multi-arc. Distance from the Sun 0.684-2.422 AU (extents, all legs, the full-revs included).
Orbit view 2.5D ecliptic projection
3D view not available for multi-arc trajectories yet. The 3D system can now render a numerically-sampled polyline (n-body or multi-arc), but no sampled trajectory is published for this row — each leg is a separate ellipse with honest gaps where elements are unpublished (the 2D view above shows them). The button will appear here once a sampled path is exported for this trajectory; we never interpolate one from the catalogue's per-leg (a, e).
Definition status
incomplete — core fields missing or known-unknowns tracked below
Known-unknowns (2)
Values we expect to exist but have not yet filled (distinct from "not applicable"). Tracked per upstream docs/spec.md §16.6.4.
Primary citation
No primary citation recorded; see the provenance tags below.
orbit fidelity circular-coplanar V∞ fidelity circular-coplanar
Corroborating sources
- Hollister, W. M. (1969). Periodic Orbits for Interplanetary Flight. Journal of Spacecraft and Rockets 6(4):366-369. DOI: 10.2514/3.29664 CLASS source: the Earth-Venus two-working-body periodic orbits (orbits I-III).
- Hollister, W. M. & Menning, M. D. (1970). Periodic Swing-By Orbits between Earth and Venus. Journal of Spacecraft and Rockets 7(10):1193-1199. DOI: 10.2514/3.30134 CLASS and METHOD source: orbits built from full-revolution (FR, 1:1) and symmetric (SY) returns only (Menning 1968 App. A-1). ev5-8 carries n:m full-revolution returns other than 1:1, outside those itineraries; structurally, no k = 4 or k = 5 one-visit structure equals an H&M orbit or a sub-period of one (data/973_ev/hm1970_subperiod_check.json; docs/notes/2026-10-07-973-two-working-body-k-extension.md secs. 2.2, 6.5).
- VanderVeen, A. A. (1969). The 1978 Venus-Swingby-To-Mercury Mission. Bellcomm Technical Memorandum TM-69-1013-2 (NASA-CR-103637, NTRS 19690023106). PERIOD lineage only: names the Earth-Venus 8-yr (five-synodic-period) near repeat; not a cycler.
Notes
Member ev5-8 of the Earth-Venus two-working-body set: both planets bend; k = 5 (2919.722 d, 7.994 yr); structure k5|RE/2:1|RE/3:2|LE>V/0s|RV/2:1|LV>E/0s. Ideal-model Lambert-leg starts 78.948906, 1121.507710 d (model epoch: both planets at angle 0 at t = 0). Worst demanded/available turn ratio 0.855. Enumeration, gauntlet and screens: docs/notes/2026-10-07-973-two-working-body-k-extension.md secs. 13-14. Family: the same two-working-body Earth-Venus class as ev-A (earth-venus-two-working-body-cycler-eva-2026) and ev-B (earth-venus-two-working-body-cycler-evb-2026): both planets bend, with returns outside the Hollister-Menning FR/SY itineraries. ev-C (earth-venus-venus-hosted-cycler-evc-2026) is a different architecture (Earth massless). No sibling among the 22 ev members shares its transfer and Venus block. (direction-dependent tilted-circle flag) does not apply: the screen status is "pass". V1 evidence (data/1025_ev_writeback_v1.json): lamberthub <= 5.4e-11 m/s on every Lambert leg; DOP853 re-fly 7.7e-02 km, gate passes on the integrated vectors. Real-ephemeris standing (rung (d), docs/notes/2026-10-11-1025-ev-realeph-rung-d.md; chains of 2 cycles = 16.0 yr; route controls Hollister 1H, ev-A and ev-B reproduce): - Standish J2000 mean elements: 4/5 PASS. JD 2462588.2 PASS (route S1, worst 0.602, re-fly 5.7e-02 km); JD 2464921.1 PASS (route S1, worst 0.622, re-fly 3.9e-03 km); epoch 2 NOT REACHED; JD 2469594.9 PASS (route S1, worst 0.797, re-fly 1.5e-02 km); JD 2471927.3 PASS (route S1, worst 0.647, re-fly 1.8e-02 km). Band at the best epoch: strictly-ballistic (turn deficit 2.7e-09 m/s per 7 cycles, numerical zero). - DE440 blend (lambda 1, minimax directions, no shoot): JD 2462588.1 gate pass 0.602, closure E/V 3.6/17.6 m/s per chain; JD 2464921.0 gate pass 0.622, closure E/V 4.0/21.1 m/s per chain; JD 2467257.3 gate pass 0.709, closure E/V 4.6/13.9 m/s per chain; JD 2469594.7 gate pass 0.819, closure E/V 3.7/47.7 m/s per chain; JD 2471927.0 gate pass 0.648, closure E/V 3.6/12.8 m/s per chain. - DE440 shoot (sec. 8): no gate-passing closure; the route cannot judge, see data_gaps. Literature: literature_check v3-A1 returns "not-found" (necessary, not sufficient; data/1025_litcheck_973_members.json). The Hollister/H&M anchor is excluded on return types. Human prior-art reading: docs/notes/2026-10-08-1025-literature-step.md sec. 5 (the ev-A/ev-B search, docs/notes/2026-10-07-942-evAB-prior-art-search.md, applies; no new search was run). OWNER DECISION 2026-10-11: candidate-novel V1 under option "(a) 10 rows, Standish >= 4/5", attributed to Hollister 1969 and Hollister & Menning 1970. Wording: "first computed", never "new class".